Shedding and cracking can result from a poor bond, unsuitable site conditions or opening the surface before it has cured. Use the installation instructions and test evidence for the specified playground system to set the working parameters.

1. Inspect and prepare the base
Confirm the base type, condition, moisture and drainage against the system specification. Resolve cracks, loose material and contamination before starting.
2. Confirm the binder and mix
Use the binder approved for the granule and system. Measure the components by the documented mix ratio and follow the specified mixing procedure. Ask the supplier about conditions outside the stated installation window before changing the formulation.
3. Check the weather and site conditions
Record air and substrate conditions and check the forecast during application and curing. Follow the system’s temperature, moisture and weather limits.
4. Place and compact each layer
Lay out the colours and joints before mixing. Place and finish the material to the specified depth and profile, paying attention to edges, seams and drainage. For colour zoning and sample review, see our EPDM granule colour guide.
5. Protect the surface during curing
Keep the area closed until it meets the manufacturer’s reopening criteria. Check finish, bond and layer depth, and arrange any required field tests before handover. For impact testing and equipment fall zones, see the guide to playground thickness and fall height.
Browse construction guides or contact FUXIN to discuss your project.








